Flooring is a craft. We treat it like one.
SolidCoat Flooring Inc. installs premium epoxy and concrete coating systems for homeowners and businesses who want a floor that actually holds up — not just one that looks good on install day.
Prep first. Everything else follows.
The single biggest factor in whether an epoxy floor lasts is what happens before the coating ever gets mixed: mechanical concrete grinding, moisture testing, and crack repair. We don't skip it, rush it, or quote around it — it's built into every project from day one.
That's the difference between a floor that peels in two years and one that's still doing its job a decade from now. We'd rather explain that to you upfront than have you find out the hard way.
A few things we won't compromise on.
Straight Answers
If your concrete has a problem, we'll tell you before it's a surprise on invoice day — not after. Written quotes, no vague line items.
Real Prep Work
Diamond grinding and moisture assessment on every job — the unglamorous work that determines whether a coating actually bonds.
Respect for Your Time
Clear scheduling, a clean job site each day, and a project that finishes when we said it would.
Want to talk through your project?
Book a free on-site visit — we'll take a look, answer your questions, and give you a straight quote.